HEAVY EQUIPMENT INSTALLATION
Once the base footing was poured, the ride's main base cylinder was lifted into place by our 75 ton crane. Then the final concrete pour of 220 yards was completed to set it into place.
After the concert footing was set, the ride was then installed using our 450 ton crane. The first section was over 22 tons with the length of 79 feet while the second section was 159' long weighing in around 30 tons.