PAN FEEDER REMOVAL AND EQUIPMENT INSTALLATION
Rozell Industries are top experts when it comes to equipment upgrades due to end of service life and/or increase equipment capacity.
For this project, Rozell demolished 30" thick concrete walls, 2" thick steel flooring, and structural steel along with the old equipment for removal. From there, our in-house detailing team created new structural steel plans for installation later completed by our install team. After the steel was in place, Rozell's expert rigging team installed the new equipment and chutes.
Rozell Provided:
- Turn Key project for an industrial setting
- Subcontractor management
- Structural steel fabrications with in-house detailing.
- Step by step planning and scheduling.
- Logistical planning for the removal offsite of old equipment with the planning of site layout to accommodate new arrivals.
- Ability to overcome difficult project demands with focus on schedule and safety
- Comprehensive EHS program