HEAVY EQUIPMENT REMOVAL AND INSTALLATION
In this project Rozell Industries was requested by a cement company to remove old ductwork and build custom ductwork fabrication to replace what was being removed.
The first stage of this project was building a new, custom replacement for the existing ductwork. Our metal fabrication team at Rozell Industries built the new ductwork from scratch using the blueprints and specs provided. Once the new fabrication was completed, we delivered the ductwork to the job site.
The second stage of this project was on site removal, using our Tadano 400G-6 450 ton and Link Belt HTC-8690 90 ton cranes, replacing old 7'x6" diameter insulated ductwork.