HEAVY EQUIPMENT INSTALLATION
Rozell East was contracted by a local refrigeration company for the removal of old equipment and subsequent chiller installation. The project involved installing 2 all new chillers and removal of the older ones. Each chiller weighs approximately 18,000 lbs and was set by our 275 ton crane.
We connected the chiller into the existing system with custom fabricated 8" carbon steel pipe lines.