COMMERCIAL CONSTRUCTION LAKE PLACID
The scope of work included in this project:
- Removal or existing floor finishes
- Temporary protection of ceiling and walls
- Create a sealed dust proof work envelope within the operating Olympic center
- Remove existing concrete floor and abandoned studio ice rink refrigerant lines embedded in concrete
- Prepare sub-base for vapor barrier, rebar mesh, and conduit
- Pour and finish floor
- Professionally clean areas of work to make ready for owner to install new flooring