COMMERCIAL CONSTRUCTION
Rozell Industries was recently hired to preform a cliff stabilization at a local mill. It measures 90 feet long by 30 feet deep by 30 feet tall. This job required eight H piles in 3 foot and four foot caissons. These were drilled between 5 and 30 feet into the ground. There are also 18 rock anchors pile drilled and grouted at a 30 degree angle into the cliff face. After these were put into place, we used our 75 ton crane to set 37 pre-cast wall panels into the H piles to construct the final face of the wall. We used a conveyor to then backfilled the wall with 2,500 cubic yards of stone. For your next commercial construction job, fill out the quote request form below.