BRIDGE INSTALLATION - GLEN CREEK


CRANE RENTAL AND EXCAVATION
Rozell worked with the Town of Johnsburg to complete a new bridge on Glen Creek Road. The project consisted of the Town hiring Rozell's 100 ton LinkBelt All-terrain crane to remove the old temporary bridge. They then install the erosion control measure to protect Glen Creek, then the town self-performed the excavation and Rozell removed bed rock to get down to proper elevation. Installation a mud mat, foundations, and new bridge abutments, and final installation of the new bridge was completed by Rozell. 

INCLUDED SERVICES:

Crane Rental
Heavy Rigging
Excavation