AMAZON FACILITIES - SITEWORK


SITEWORK FOR AMAZON WAREHOUSE IN GRANVILLE, NY
This project had an accelerated schedule of only 7 months to complete and the Rozell team worked tirelessly and ensured that this project got delivered on time as we promised. This effort included major sitework challenges of a wet spring and summer season along with the unforeseen quantity of approximately 10,000 Cubic Yards of unsuitable materials that had to be excavated, removed off site and then replaced with new materials with no additional time on the project schedule. Specialized material and equipment delay due to lack inventory that forced Rozell’s team to again step up to the plate and resource alternates that were of an equal or greater alternate that could be source within the schedule, including providing and using temporary equipment and systems until the permanent arrived.

INCLUDED SERVICES:

– Multi acre SWPPP / Erosion Control
– Two large retention ponds
– Install approximately 2,500 LF of large diameter Reinforced Concrete Pipe (RCP) with related manholes, catch basins and outlets.
– New Sewer Pump Station
– Removal of approximately 25,000 cyds of material off site
– Import approximately 20,000 cyds fill
– Importing and placing approximately 30,000 tons of stone. 
– Concrete Paving approximately 80,000 SF
– Asphalt Paving approximately 182,000 SF
– Sidewalks approximately 11,000 SF
– Directional and Parking Signage
– Light Pole Bases
– Site Electrical Trenching

Next Project >

HAVE A PROJECT? REQUEST A QUOTE.

We would love to discuss your upcoming project with you. Please fill out the brief form below to get things started. We'll contact you as soon as possible to discuss your project in more detail. 

For immediate assistance, please call us at: (877) 501-0055

Contact Us

Share by: