GLASS INSTALLATION FOR ALBANY AIRPORT
The project required specialized heavy equipment capabilities due to the bell's substantial weight and the precision needed for safe handling of this irreplaceable historic artifact. Rozell Industries provided a 26-ton boom truck along with an experienced operator to execute the delicate lifting and placement operation. The skilled operator ensured the bell was safely extracted from its original mounting, transported, and carefully positioned in its new outdoor display location where it will be accessible to the community and visitors.