Millwrighting - Equipment Rebuild

After years of patching hot gas ductwork, our client decided to replace major sections of duct. In conjunction with existing system drawings, field dimensions were verified and detailed shop drawings were developed.

Our own custom fabrication shop was then responsible for the production of the five sections to be replaced. Each section was formed and MIG welded to full strength, gas tight and conformed to American Welding Society codes. The exterior of those sections were sandblasted then coated with a heat resistant red primer. Prior to shipment, four inches of mineral wool insulation was pin welded to the outside and an embossed aluminum jacketing was attached to stainless steel stand-offs.

On site demolition and installation was accomplished with the use of two ninety ton cranes, one forty ton crane and a one hundred and eighty foot artculating boom-lift. The shutdown of the clients process was limited to two weeks. Start up of the equipment was accomplished without unexpected problems.

 

001A.JPG 002A.JPG
Detailing and Material Verification. Three Dimesion Computer Layout.
006A.JPG 007A.JPG
Existing Structure. 150 foot High Work Point.
008A.jpg 009A.jpg
Elbow Transition. Transitional Stiffener Layout.
010A.jpg 011A.JPG
Wye-Lateral. Stem Section.
012A.JPG 013A.JPG
Expansion Joint Support Ring. Insulation of Elbow.
014A.JPG 015A.JPG
Expansion Joint, Duct Insulation. Field Insulating Wye-Stem.
016A.JPG 017A.JPG
Client Supplied Component to be
Insulated and Installed.
Demolition of Worn Gas Ducts.
018A.JPG 019A.JPG
Removal of Old Insulation Prior
to Scrapping.
Transition Area.
020A.JPG 021A.JPG
Demo'ed Duct Laydown Area. Demolition to Scrap Metal.
022A.JPG 023A.JPG
Extent of Demolition. Installation of Wye-Lateral.
024A.JPG 025A.JPG
7'-6" Dia. Duct Section. 7'-6" Dia. Duct Section.
026A.JPG 027A.JPG
7'-6" Dia. Duct Section. Expansion Joint.
028A.JPG 030A.JPG
Hoisting Expansion Joint Using
150 Ton Crane.
180 foot Articulating Boom Lift.
033A.JPG 034A.JPG
Personnel Basket Attached to
150 Ton Crane.
Installed Expansion Joint.
036A.JPG 041A.JPG
7'-6" Diameter Elbow. Preparing Sections to accept Elbows.
042A.JPG 044A.JPG
Installation 7'-6" Diameter Elbow. Installation 7'-6" Diameter Elbow.
045A.JPG 046A.JPG
Installation 7'-6" Diameter Elbow. Installation 7'-6" Diameter Elbow.
047A.JPG 048A.JPG
Installation 7'-0" Diameter Elbow. Installation 7'-0" Diameter Elbow.
049A.JPG 050A.JPG
Installation 7'-0" Diameter Elbow. Installation 7'-0" Diameter Elbow.
051A.JPG 052A.JPG
Installation 7'-0" Diameter Elbow. Last Connection.
054A.JPG 055A1.JPG
Finshing Insulation and Jacketing
of Field Connections.
Overall Project.

 