First phase was the installation of a chute for fish to bypass a hydroelectric facility.
Second phase of the project was the replacement of 22 foot long trash racks: existing 3"x3/8" flat bar, spaced 3" apart with 2-1/2"x3/8" flat bar, spaced 1" apart.